------------------------------------------------------------ Date: Sat Aug 4 08:03:44 2001, Shift: 00:00-08:00 Supervisor: KH, with: A. Hanssen Log book#7 pages 17 - 18 Shift Summary: ------------------------------------------------------------ No beam for entire shift. Accelerator apparently recovered from fire. Beam was estimated at ~2:00am, but failed to materialize during the whole night. In anticipation of beam at 2:00am, we Magnets were left on. TPC and DC anodes are off (except T1 anode is at 900V) ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Sat Aug 04 2001 - 08:04:46 EDT