------------------------------------------------------------ Date: Sat Sep 2 15:53:43 2000, Shift: 08:00-16:00 Supervisor: MM, with: EJ Log book#5 pages 76 - 77 Shift Summary: ------------------------------------------------------------ 1. Beam until 8:35 and then from 11:35 to 12:45. 2. Run 2505. MRS at 40 deg, FF at 4 deg and BF at 4 deg. 3. Signal again in Tile5_3(34) for run 2505. BRAHVO does not turn on anodes on T3 if they have tripped. The BRAHVO "check all" diden't work. ------------------------------------------------------------
This archive was generated by hypermail 2b29 : Sat Sep 02 2000 - 15:54:11 EDT