------------------------------------------------------------ Date: Sat Sep 2 07:58:42 2000, Shift: 00:00-08:00 Supervisor: HI, with: Log book#5 pages 75 - 76 Shift Summary: ------------------------------------------------------------ 1. Beam came back at 3:46. 2. Run2498. MRS at 40 deg, FF at 4 deg and BF at 4 deg. 3. Tile5_3(34) again did not have signal. It has bad or lose patch cable. The shift people needs to check this after start of run by SuperMon. It should be easily visible by empty slot in Tile summary around detector #34. Only thing to fix this problem is to wiggle the patch cables. ------------------------------------------------------------
This archive was generated by hypermail 2b29 : Sat Sep 02 2000 - 07:59:25 EDT