Shift report 20000902 00:00-08:00

From: http account (http@pii3.brahms.bnl.gov)
Date: Sat Sep 02 2000 - 07:58:42 EDT

  • Next message: http account: "Shift report 20000902 08:00-16:00"

    ------------------------------------------------------------
    Date: Sat Sep  2 07:58:42 2000, Shift: 00:00-08:00
    Supervisor: HI, with: 
    Log book#5 pages 75 - 76
    
    Shift Summary:
    ------------------------------------------------------------
    1.  Beam came back at 3:46.
    2.  Run2498. MRS at 40 deg, FF at 4 deg and BF at 4 deg.
    3.  Tile5_3(34) again did not have signal.  It has bad or
    lose patch cable.  The shift people needs to check this 
    after start of run by SuperMon.  It should be easily visible
    by empty slot in Tile summary around detector #34.  Only
    thing to fix this problem is to wiggle the patch cables.
    
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b29 : Sat Sep 02 2000 - 07:59:25 EDT