------------------------------------------------------------ Date: Thu Aug 17 23:44:52 2000, Shift: 16:00-24:00 Supervisor: RW, with: KO,B3 Log book#4 pages 112 - 114 Shift Summary: ------------------------------------------------------------ 1. Beam was cogged at 19:55 with I_b=9.6e9 and I_y=10.9e9. Trigger 1 rate was around 60. The beam is still going on. 2. Note that D1 and D2 polarity was reversed with the same magnitude before this shift. RD wanted to optimize the anode voltage of MTCP1. Different voltage was applied on MTCP1. MTCP1 anode(V) no of events run 2325 1100V 20K (trigger 1) run 2326 1150V 20K run 2327 1250V 20K run 2329 1300V 37K fb1 taken out run 2330 1275V 20K run 2332 1225V 20K run 2333 1200V 20K run 2334 1175V 20K run 2335 1125V 20K Survey data run finished. Anode voltage is set 1200V the same value as that before this survey. run 2336 started at 11:37 with the trigger 1 rate of 20-25. 3. Dead time was found 75%. KO found that fb1 caused the problem. fb1 is taken out from the DAQ (It is doing nothing, according to KO). Dead time becomes about 20-25% at the trigger rate of 100 (75-80 events are taken). T3 cannot hold any voltage. Wire might be broken. ------------------------------------------------------------
This archive was generated by hypermail 2b29 : Thu Aug 17 2000 - 23:48:28 EDT