------------------------------------------------------------ Date: Mon Aug 7 15:35:35 2000, Shift: 08:00-16:00 Supervisor: EJK, with: B3,B4 Log book#4 pages 23 - 23 Shift Summary: ------------------------------------------------------------ 1. "Power Dip" -> "Power Supply Failure" -> "Yellow injection kicker failure" -> "No beam expected before 21:00" 2. No achievment 3. Mainframes are still unreacheable. HV control panels(for TPC gating grid) are not working. ------------------------------------------------------------
This archive was generated by hypermail 2b29 : Mon Aug 07 2000 - 15:39:56 EDT