Shift report 20000807 00:00-08:00

From: http account (http@pii3.brahms.bnl.gov)
Date: Mon Aug 07 2000 - 07:58:07 EDT

  • Next message: http account: "Shift report 20000807 08:00-16:00"

    ------------------------------------------------------------
    Date: Mon Aug  7 07:58:07 2000, Shift: 00:00-08:00
    Supervisor: DO, with: ZIS
    Log book#4 pages 21 - 22
    
    Shift Summary:
    ------------------------------------------------------------
    1.MC dumped the beam at 1:00. They worked on injection, did a 
    ramp that failed. Problems of quench interlock in the blue 
    ring. Power dip from 2:30 up to now.
    2.The only achievement is run 2080 started at 20:42 
    (previous shift) and stopped at 00:50.
    3.No new problems (mainframe FFS1440 still unreachable)
      BB delta time still shows a shift
      Collision rate low
    ------------------------------------------------------------
    