Shift report 20000725 16:00-24:00

From: http account (http@pii3.brahms.bnl.gov)
Date: Tue Jul 25 2000 - 00:05:03 EDT

  • Next message: http account: "Shift report 20000725 00:00-08:00"

    ------------------------------------------------------------
    Date: Tue Jul 25 00:05:02 2000, Shift: 16:00-24:00
    Supervisor: kh, with: yb
    Log book#3 pages 68 - 68
    
    Shift Summary:
    ------------------------------------------------------------
    No beam during entire shift.
    
    Investigations of problems that have appeared since opening.
    1. ZDC nominal voltages different from measured voltages.
       M. M. says that is a problem in reading.  The VME card
       reading voltages apparently gives a consistent high
       reading.  This was checked manually long ago and real
       voltages were found to be very near nominal voltage.
    
    2. Read ZDC ntuples right before shutdown (1609) and first 
       real run after shutdown (1908)  Looking at ZDC ADC with
       BBMult's < 1 gives single neutron peak for earlier run
       but not later run.  Spectra also look completely
       different.
    
    TPC voltages off during entire run.
    
    SuperMon problems:
    SuperMon did not run first time I started it.  One in my 
    (kh) directory did!.  First I rebuilt SuperMon alone.
    Same result.  Then I rebuilt the online monitors in the
    online directory.  Same result.  So I rebuilt brat in 
    operator account using make clean then make and then it 
    ran.  This presumably ran before.  This seems to be a
    frequent occurence.  What is always causing this to
    quit running???
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b29 : Tue Jul 25 2000 - 00:09:31 EDT