Date: Wed Jun 28 23:59:48 2000, Shift: 16:00-24:00
Supervisor: FR, with: ZIS, TK
Log book#2 pages 92 - 93
Shift Summary:
------------------------------------------------------------
- No beam during this shift. Mainly work on preparing for
injection. Problems with the blue beam (quench link).
Current status "Working to recover from quench link in
blue ring".
- T2A has a new voltage configuration (RD); Anode : +1450V,
Field wires : +400V.
TPC anode voltages are off.
- No detector problems.
------------------------------------------------------------