Shift report 20000628 16:00-24:00

From: http account (http@pii3.brahms.bnl.gov)
Date: Wed Jun 28 2000 - 23:59:49 EDT

  • Next message: http account: "Shift report 20000629 00:00-08:00"

    ------------------------------------------------------------
    Date: Wed Jun 28 23:59:48 2000, Shift: 16:00-24:00
    Supervisor: FR, with: ZIS, TK
    Log book#2 pages 92 - 93
    
    Shift Summary:
    ------------------------------------------------------------
     - No beam during this shift. Mainly work on preparing for
       injection. Problems with the blue beam (quench link).
       Current status "Working to recover from quench link in
       blue ring".
    
     - T2A has a new voltage configuration (RD); Anode : +1450V,
       Field wires : +400V.
       TPC anode voltages are off.
    
     - No detector problems.    
        
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b29 : Thu Jun 29 2000 - 00:04:18 EDT