[Brahms-dev-l] Status of calibrations

From: Truls Martin Larsen <trulsml@nbi.dk>
Date: Tue Jun 27 2006 - 10:31:07 EDT
Hi,

current status of the calibrations:

All pedestals are done
TPC  all done.
DC  missing the last ~50 runs. What is the status Pawel, when
    will they be done?

BB   only some ADC gain (missing the last ~100 runs)
CC   nothing done... What is the status Dana, when will they be done? 

RICH Need the gasparameters/index of refraction calibration
C4   Needs the ADC gain 

TOF  walls depend on start time... which is needed before this
     calibration can start. I guess that it means that TrFS and
     TrMRS also needs to be calibrated. Some of those will be done
     at NBI and some in Kansas...

As soon as the DC calibs are done we can get real production of local
tracks.

Anybody who want to do calibrations are welcome, but need to communicate
this to the person responsible for calibrating that detector (see
above). If unsure write me an email!!! 

Cheers,
	Truls

_______________________________________________
Brahms-dev-l mailing list
Brahms-dev-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-dev-l
Received on Tue Jun 27 10:31:58 2006

This archive was generated by hypermail 2.1.8 : Tue Jun 27 2006 - 10:32:06 EDT