Hi, current status of the calibrations: All pedestals are done TPC all done. DC missing the last ~50 runs. What is the status Pawel, when will they be done? BB only some ADC gain (missing the last ~100 runs) CC nothing done... What is the status Dana, when will they be done? RICH Need the gasparameters/index of refraction calibration C4 Needs the ADC gain TOF walls depend on start time... which is needed before this calibration can start. I guess that it means that TrFS and TrMRS also needs to be calibrated. Some of those will be done at NBI and some in Kansas... As soon as the DC calibs are done we can get real production of local tracks. Anybody who want to do calibrations are welcome, but need to communicate this to the person responsible for calibrating that detector (see above). If unsure write me an email!!! Cheers, Truls _______________________________________________ Brahms-dev-l mailing list Brahms-dev-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-dev-lReceived on Tue Jun 27 10:31:58 2006
This archive was generated by hypermail 2.1.8 : Tue Jun 27 2006 - 10:32:06 EDT