Hi, all pedestals are commited for pp 62GeV. A note to the one doing CC calibs: In pedestal run: 16028 16096 16184 CC right tube nr 2 did not give any signal. The values commited for these runs for tube nr 2 are from the previous pedestal run. So be on a lookout for problems when calibrating tube nr 2. The RICH: tube 289-320 had very high pedestal values, around 500, (about 150-250 higher than last year). These values are commited. But be on a lookout for strange behavior when calibrating the RICH for these tubes! Calibrations scripts etc, can be found in: ~bramreco/DataReduction/run06/calibPed/ Cheers, Truls -- *---------------------------------* |http://www.nbi.dk/~trulsml / |Truls Martin Larsen / |trulsml@nbi.dk . |The Niels Bohr Institute // |Work Address: / \0 |Blegdamsvej 17 /\_/ |DK-2100 Copenhagen / / |Tel: +45 353 25269 / -- | /_/ | |Home address: / \ |Holger Danskes Vej 28H| ' |DK-2000 Frederiksberg | |Denmark | |Mob: +45 20974802 | *----------------------* _______________________________________________ Brahms-dev-l mailing list Brahms-dev-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-dev-lReceived on Thu Jun 22 12:16:28 2006
This archive was generated by hypermail 2.1.8 : Thu Jun 22 2006 - 12:16:42 EDT