[Brahms-dev-l] All pedestals for pp62 commited

From: Truls Martin Larsen <trulsml@nbi.dk>
Date: Thu Jun 22 2006 - 12:15:55 EDT
Hi,

all pedestals are commited for pp 62GeV.

A note to the one doing CC calibs:
In pedestal run:
16028
16096
16184

CC right tube nr 2 did not give any signal. The values commited for
these runs for tube nr 2 are from the previous pedestal run. 
So be on a lookout for problems when calibrating tube nr 2.

The RICH:

tube 289-320 had very high pedestal values, around 500, (about 150-250
higher than last year). These values are commited. But be on a lookout
for strange behavior when calibrating the RICH for these tubes!

Calibrations scripts etc, can be found in:
~bramreco/DataReduction/run06/calibPed/

Cheers,
	Truls

-- 
*---------------------------------*
|http://www.nbi.dk/~trulsml      /
|Truls Martin Larsen            /
|trulsml@nbi.dk                .
|The Niels Bohr Institute     //
|Work Address:               / \0
|Blegdamsvej 17             /\_/
|DK-2100 Copenhagen        /  /
|Tel: +45 353 25269       / --
|                        /_/  |
|Home address:          /     \
|Holger Danskes Vej 28H|      '
|DK-2000 Frederiksberg |
|Denmark               |
|Mob: +45 20974802     |
*----------------------*

_______________________________________________
Brahms-dev-l mailing list
Brahms-dev-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-dev-l
Received on Thu Jun 22 12:16:28 2006

This archive was generated by hypermail 2.1.8 : Thu Jun 22 2006 - 12:16:42 EDT