[Brahms-dev-l] TPC calibration done

From: Truls Martin Larsen <trulsml@nbi.dk>
Date: Thu Jun 22 2006 - 05:01:19 EDT
Hi,

TPC calibrations are done for the entire run. There might be an issue
with the drift velocity in T2, but that has to investigated when
matching of tracks (GTR or DST) have been made. The vdrift is at least
relatively constant at around 0.00145... DVM's have suggested it should
be more in the area of 0.0017... Also, there might be a need for an
extra calibration in between here and there...

I have pedestals for all the non-TPC pedestals runs. I'm in progress of
checking them, and will commit shortly.

Cheers,
	Truls

-- 
*---------------------------------*
|http://www.nbi.dk/~trulsml      /
|Truls Martin Larsen            /
|trulsml@nbi.dk                .
|The Niels Bohr Institute     //
|Work Address:               / \0
|Blegdamsvej 17             /\_/
|DK-2100 Copenhagen        /  /
|Tel: +45 353 25269       / --
|                        /_/  |
|Home address:          /     \
|Holger Danskes Vej 28H|      '
|DK-2000 Frederiksberg |
|Denmark               |
|Mob: +45 20974802     |
*----------------------*

_______________________________________________
Brahms-dev-l mailing list
Brahms-dev-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-dev-l
Received on Thu Jun 22 05:01:48 2006

This archive was generated by hypermail 2.1.8 : Thu Jun 22 2006 - 05:02:02 EDT