I've placed a .pdf version of the slides referenced below at http://kunuc6.phsx.ukans.edu/~sanders/63GeV_Centrality/ CentCalibrationAt63GeV.pdf ...Flemming tells me that the unfortunate non-Mac users out there can't read my ppt file... ...steve On Friday, June 18, 2004, at 11:48 AM, Stephen J. Sanders wrote: > Hi, > Yesterday I committed a new multiplicity to centrality calibration for > the 63 GeV AuAu runs. > Djamel had noted that my previous calibration led to an increase in > the centrality spectrum for > more central events when the BB trigger was added in addition to the > ZDC trigger, even if there > was no downscaling of the ZDC. The previous calibration was based on > the false assumption that > the ZDC would be efficient for central events. The new calibration > assumes the ZDC is efficient for > those peripheral events where the tile multiplicity is >=4, but is NOT > efficient for the more central > events. > > I've put some details on the ZDC inefficiency at > http://kunuc6.phsx.ukans.edu/~sanders/63GeV_Centrality/ > CentCalibrationAt63GeV.ppt > > At this point there should be reasonably good year 2004 calibrations > for both 200 GeV AuAu and > 63 GeV AuAu corresponding to runs (200 GeV) 9389, 9701, (63 GeV) > 11298, 11523. > > We will now start a systematic calibration of the other runs for 04. > > Regards, > Steve > > > _______________________________________________ > Brahms-dev-l mailing list > Brahms-dev-l@lists.bnl.gov > http://lists.bnl.gov/mailman/listinfo/brahms-dev-l _______________________________________________ Brahms-dev-l mailing list Brahms-dev-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-dev-lReceived on Mon Jun 21 09:42:56 2004
This archive was generated by hypermail 2.1.8 : Mon Jun 21 2004 - 09:43:16 EDT