From: Truls Martin Larsen (t.m.larsen@fys.uio.no)
Date: Thu Apr 10 2003 - 07:38:13 EDT
Sorry about that! I commited them! I will divide by 1000 and commit again. I'll send a message when it is done. I've continued, with Ian's help, the calibrations of the dAu run. Calibrations commited so far can be seen here, (the Tdc gain figure will be remade!!!): http://www4.rcf.bnl.gov/~trulsml/calibrations If I'm doing something that anybody else is also doing let me know! Soon back with an update, Truls Flemming Videbaek wrote: > We need a mechanism for telling each other when calibrations are > inserted into the DB. > And the content has to be checked before being inserted. > As a minimum send a short notice to the dev-list > this bla bla has been done / inserted for runs.. so one has a chance > to understand > why things may work differently. > > Case in point > Today a calibration for Td1 timing were inserted and the value put = > there are in psec/ch instead of nsec as > should be - So the code must also have been changed -- and caused = > several jobs not to work at all. > By the way the at least TOF1 is also in error. > > So whoever is responsible please correct as soon as possible. > > Please be careful out there, > many people are depending on this being done correctly. > > Flemming > > ------------------------------------------------------ > Flemming Videbaek > Physics Department > Brookhaven National Laboratory > > tlf: 631-344-4106 > fax 631-344-1334 > e-mail: videbaek@bnl.gov <mailto:videbaek@bnl.gov> -- *------------------------------* |http://folk.uio.no/truml / |Truls Martin Larsen / |T.M.Larsen@fys.uio.no . |University of Oslo // |Department of Physics / \0 |P.O.Box 1048 Blindern /\_/ |0316 Oslo, Norway / / |Tel: +47 22854331 / -- | /_/ | |Home address: / \ |Eiksvn 58 | ' |1361 Østerås | |Tel: +47 67155618 | |Mob: +47 99691838 | *------------------*
This archive was generated by hypermail 2.1.5 : Thu Apr 10 2003 - 07:39:12 EDT