From: Flemming Videbaek (videbaek@sgs1.hirg.bnl.gov)
Date: Wed Apr 09 2003 - 13:34:54 EDT
We need a mechanism for telling each other when calibrations are
inserted into the DB.
And the content has to be checked before being inserted.
As a minimum send a short notice to the dev-list
this bla bla has been done / inserted for runs.. so one has a chance to understand
why things may work differently.
Case in point
Today a calibration for Td1 timing were inserted and the value put =
there are in psec/ch instead of nsec as
should be - So the code must also have been changed -- and caused =
several jobs not to work at all.
By the way the at least TOF1 is also in error.
So whoever is responsible please correct as soon as possible.
Please be careful out there,
many people are depending on this being done correctly.
Flemming
------------------------------------------------------
Flemming Videbaek
Physics Department
Brookhaven National Laboratory
tlf: 631-344-4106
fax 631-344-1334
e-mail: videbaek@bnl.gov
This archive was generated by hypermail 2.1.5 : Wed Apr 09 2003 - 13:32:57 EDT