The work I annouched last week to check out how to update the DB and access it in a 'machine' independent way is basically done The read/write works from both linus,solaris and is basically ready to be committed. I though think for several reasons that the actual conversion should wait to next week. a) the run is ongoing b) several analysis is going on Mult for the paper as wel as spec analysis c) I would like to have Peter modify the TPC tables as discussed and lastly d) I do not think I have the time tomorrow, and then an update would be then be too close to Thanksgiving. The proposal is to performe the conversion Monday 25 in the afternoon. This implies the DB will be locked during the conversion, access with current Brat will cease to work, requiring an update of all code for both reading and writting. ------------------------------------------------------ Flemming Videbaek Physics Department Brookhaven National Laboratory tlf: 631-344-4106 fax 631-344-1334 e-mail: videbaek@bnl.gov
This archive was generated by hypermail 2b30 : Mon Nov 19 2001 - 20:20:14 EST