Run Plan
- Detector has been assembled (Dec.-Jan.), ᢗ% success rate
- Start current run with setup similar to what we had in engineering run
- ~two week shutdown after machine becomes stable, install full (1.5 arms) detector
- second arm modules finished by end of the summer