PPT Slide
Accesses are quick and easy
- No (or minimal) shielding work needed.
No PHOBOS-specific planned access needed
- Almost all accesses should coincide with planned down time for RHIC or other detector.
- Request: When possible, long beam-down times should be scheduled well in advance.
PHOBOS Year 1 Access Request