¥By the end of July we
plan to have drafts of the following papers:
¥The T0
counters (to be submitted to NIM): contains detailed performance studies of the
T0 counters and their performance in Au+Au in PR01.
¥The
time-equalizer module (to be submitted to NIM): contains design concepts and
stability studies.
¥By the end of August we
plan to have drafts of the following papers:
¥The
TOF array (to be submitted to NIM): contains detailed performance studies of
the TOF counters and their performance in Au + Au in PR01.
¥Particle
ratios as function of centrality and pt for Au+Au at 200 GeV (to be submitted to PRC)??