¥By the end of July we plan to have drafts of the
following papers:
¥The T0 counters (to be submitted to NIM):
contains detailed performance studies of the T0 counters and their performance
in Au+Au in PR01.
¥The time-equalizer module (to be submitted
to NIM): contains design concepts and stability studies.
¥
¥By the end of August we plan to have drafts of the
following papers:
¥The TOF array (to be submitted to NIM):
contains detailed performance studies of the TOF counters and their performance
in Au + Au in PR01.
¥Particle ratios as function of centrality
and pt for Au+Au at 200 GeV
(to be submitted to PRC)??