¥Assuming we have the required number of events to do
the TOF calibrations:
¥
¥Determine the time delay calibration
parameters (based on DV output): 2 days.
¥
¥Create the track DSTs: ? days.
¥
¥First order slew optimization: 1
week.
¥
¥Major concerns:
¥
¥Collision time resolution.
¥
¥Time structure in TOF looks similar to
structure in T0. How many prompt
hits do we see?