¥At the end of the pp
run, the T0 counters will need to be removed to allow the installation of the
beam-pipe protection system.
¥Nazim and Erik signed up
for shifts at the end of the p+p run and will remove the T0 counters as soon as
there is access at the end of the p+p run.
¥We propose to reinstall
the T0 counters behind ring 3 on both P and N sides (which is their appropriate
location for the Au+Au run).