¥At the end of the pp run, the T0 counters will need to
be removed to allow the installation of the beam-pipe protection system.
¥
¥Nazim and Erik signed up for shifts at the end of the
p+p run and will remove the T0 counters as soon as there is access at the end
of the p+p run.
¥
¥We propose to reinstall the T0 counters behind ring 3
on both P and N sides (which is their appropriate location for the Au+Au run).