The program:
1) 1 normal pedestal and calibration run every two hours at
4,6,8,10,12pm,2,4am.
2) at all times in between the ped/cal runs: a continues slow run
3.) at 4am Pradeep will start a long slow run until 10am. (If any slow run
stops Person on shift has to restart it
Pradeep will write a brief summary on how to start/stop a run until he
leaves today.
1) will allow us to check if there are any strong drifts and if there are
any drifts, we can check with the slow runs (2) what happened at what time
We will run at least until 10am and at 10am decide how if we continue. The
default is to continue unless the need ring or other intervention
The shift list:
Rachid until 12pm midnight
Pradeep 12pm-4am
Nigel 4am-10am
Gerrit+Heinz 10am+
The checklist:
Every 30min:
Every 60 minutes
Check in tunnel the cooling system:
On old slow controls computer:
Switching off:
1.) ramp down VBC on slow control
2.) switch off FEC LV on slow control
3.) notify
Gerrit: 516 399 7656, 617 216 4303
Heinz: 516 941 3909, 617 216 7522
Rachid: 516 821 1440
When to switch off:
a.) if cooling flow stops in any of the flow meters or tubes
b.) if any of the FEC LV current -6 or -3 on the slow control increases
by more than 2 A or +3 or +6 currents increase by more than 1 A.
c) if spectrometer temperature>60C or octagon temperature>100