Gerrit van Nieuwenhuizen and Rachid Nouicer
Procedure made by : August 17, 2001
Shift Crew responsibility
- make sure that beams are stored and cogged
for 15 minutes without major
losses before ramping up silicon bias
- check radiation levels on chipmunks, should be less than 300 Microrad/Second.
If not don't switch on silicon, call Expert
Notes :
1 - Data taking for Stored and Cogged Beam (no
Steering)
: say the
following magic words :
- we are happy about
the collision rate (if the collision rate is reasonable)
- ask MCR what their
plans for this store are, will they steer the beam ?
- if they want to do
steering then don't ramp up the bias, wait until they have
finished steering and call them again
- tell them that you
would like to switch on silicon and ask them
if they expect the conditions to be
stable
- ask MCR to alert
PHOBOS 10 minutes before they dump the beam, so that we
can switch off the
silicon
- thank them for their
efforts
if FEC Low Voltage Power Supplies is already ON jump to Step 2.
if FEC LOW Voltage Power Supplies is OFF follow instruction :
if FEC Low Voltage Power Supplies is already on, use document "Magnet, General
Information/Help" for ramping the magnet.
- The Silicon FEC Low Voltage Power Supplies should be already ON,
DAQ is running without writing and no Latchup.
- For Latchup see latchup section in this document.
- Check the radiation levels on the Chipmunks again, should be less
than 300 Microrad/Second
If not, don't switch on silicon, switch off FEC Low Voltage, call expert..
- Ramp up the Silicon Bias by clicking on the green
button under the Bias Power Supplies Control on SiMon
- Click on <Restart ROCDB> under the <SiExpert> menu on the DAQ gui.
- Wait until the Silicon Bias has ramped up and all indicators are
green
- During the bias ramps, the Central Alarmer will go off, this is
normal
- After the Silicon bias turned on, one FEC (FEC 27) will have
latched up, and both the Latchup
window on the <OnLatchup1> and the <OnlLatchup 2> client will turn red, and
the <Central Alarmer > will sound
- Follow the instructions for
below
- Stop the run on the DAQGui
- Enable writing to Disk
- Wait for 5 minutes after the Si bias has been ramped up to give
the system time to stabilize
- Start a new run, reset scalers
- you are now taking data
2 - End of the Store
1) If dumping (or
quenching) of store by RHIC leads to the Latchup with the number
of ports with Vfp = 0 is less than or equal 8
:
1- Stop the run.
Start a new one without writing.
2- Click on the button
3- click on <Reset Latchup
under the <SiExpert> menu on the DAQ gui.
<OnLtchup1 (after 40 seconds) > and <OnLatchup2 (takes upto 2
minutes)
windows should be green
4- Click on <Restart ROCDB> under the <SiExpert> menu on the DAQ
gui.
5-Click on the Si hybrids on
the portal and check Vfp (Vfp should not be
equal to 0) and if Vfp not equal to 0 latchup Reset was successfull. You are ready for next
Store.
6- If latchup
persist Call Silicon Expert.
2) If dumping (or quenching )
of store by RHIC leads to the Latchup with
(Vfp =0) larger than 8
ports latched up :
1- Stop the run
2- Click on the button
and call Silicon expert
- If the 8 ports or more
with Vfp = 0 appear exclusively in the FECs 17,18,19,20,21 and 22,
- click on
the button
on the bottom part of the screen
on SiMon .
- follow
instruction
- If you have general latchup
more than 8 ports with Vfp=0 including some
FECs from 17 to 22 and
call Silicon expert before proceeding to next step :
2- Click button
on the bottom part of the screen on SiMon
3- Wait 10 minutes before switching
ON FEC Low Voltage Power Supplies
4 - In meantime you can ramp down
Phobos magnet
5 - follow instruction
- Stop the run
- Click on the button
- Don't TURN OFF the Low Voltage Power Supplies.
in case of power dip or storm (bad weather) or ...
- Stop the run
- Click button
on the bottom part of the screen on SiMon
3 - When Latchup happens, what should you do ?
- Initial state after ramping up the Silicon Bias
- Click on the Si hybrids on the portal which should not be
(old).
- After ramping up the bias the following
FEC ports will have latched up:
FEC Port
27
0&1&2&3
If more ports are latched up call a
Silicon EXPERT
- Click on <Reset Latchup> under the <SiExpert> menu on the DAQ
gui.
- Click on <Restart ROCDB> under the <SiExpert> menu on the DAQ gui.
- After 40 seconds, the <OnLatchup1> and
<OnLatchup2 ( need 2 minutes)>
windows should be green . Click on the Si hybrids on the portal and check
Vfp (Vfp should not be equal to
0), otherwise call Silicon EXPERT
- If you have a latchup, as indicated by the <OnlLatchup1> or <OnLatchup2>
display, you should:
- Stop the run. Start a new one without
writing.
- Click on <Restart ROCDB> under the <SiExpert>
menu on the DAQ gui.
- Click on the Si hybrids on
the portal which should not be (old).
- Record in the online logbook which, and how many,
FEC/Ports have
Vfp = 0 (last column) :
1 - If the number of ports with Vfp
= 0 is less than or equal to 8,
click on <Reset Latchup under the <SiExpert> menu on the DAQ gui.
<OnLtchup1 (after 40 seconds) > and <OnLatchup2 (takes
upto 2 minutes) windows should be green
2- If the number of ports with Vfp = 0 is
larger than 8, call Silicon Expert
- If the 8
ports or more with Vfp = 0 appear in the FECs 17,18,19,20,21 and 22,
- click on the button
on the bottom part of the screen
on SiMon
.
- follow instruction
- If you
have general latchup more than 8 ports with Vfp=0 including some
FECs from
17 to 22 and call Silicon expert before proceeding to next step :
1- Click button
on the bottom part of the
screen on SiMon
2- Wait 10 minutes before switching
ON FEC Low Voltage Power Supplies
3- In meantime you can ramp down
Phobos magnet
4- follow instruction
- Initial state after switching on the silicon FEC Low Voltage Power
Supplies
- Click on <Restart ROCDB> under the <SiExpert> menu on the DAQ gui.
- Click on the Si hybrids on the portal which should not be
(old)
- After switching on the silicon FEC Low Voltage Power Supplies,
the following FEC ports will have latched
up:
FEC Port
9 2&3
17 3
18 3
21 2&3
27 2&3
If more ports are latched up call a
Silicon EXPERT
- Click on <Reset Latchup> under the <Expert> menu on the DAQ
gui.
- Click on <Restart ROCDB> under the <SiExpert> menu on the DAQ
gui.
- Click on the Si hybrids on the portal and check Vfp
(Vfp should be not equal to 0)
- After 20 seconds, the <OnLatchup1> and
<OnLatchup2 (need 2 minutes)> windows should be green, otherwise call Silicon
EXPERT
- Initial state after switching on the silicon FEC Low Voltage Power
Supplies
- Click on <Restart ROCDB> under the <SiExpert> menu on the DAQ
gui.
- Click on the Si hybrids on the portal which should not be
(old)
- After switching on the silicon FEC Low Voltage Power Supplies,
the following FEC ports will have latched
up:
FEC Port
17 3
18 3
21 2&3
If more ports are latched up call a
Silicon EXPERT
- Click on <Reset Latchup> under the <Expert> menu on the DAQ
gui.
- Click on <Restart ROCDB> under the <SiExpert> menu on the DAQ
gui.
- Click on the Si hybrids on the portal and check Vfp
(Vfp should be not equal to 0)
- After 20 seconds, the <OnLatchup1> and
<OnLatchup2 (need 2 minutes)> windows should be green, otherwise call Silicon
EXPERT
- Kill DAQGui, if it is running, by doing the following:
1) stop the run, if it is active
2) click <Quit PHATDAQ> under <File> menu
3) type <control-C> in the RUN
xterm
- DO NOT PERFORM THIS STEP IF THIS IS JUST FOR
switch on the silicon FEC Low Voltage Power Supplies by doing the
following (make sure lights in the tunnel are off) :
1) click green <ON> button in FEC PS Control on
SiMon
2) all the status buttons should appear as <ok>
and be green, with the
exception of 2 red
buttons under <OctVtx> (this is normal and will go
away in a few steps) .
The alarmer will sound, this is normal.
- start up the DAQGui by clicking on the PhatDAQRunControl icon on
the desktop. See also instructions for starting the DAQ.
- Wait until the DAQGui has appeared and the message "Ready to
receive initialization parameters"
has appeared in the <SiROC Messages> then you must click on the <Init
Silicon> item under the <Expert> menu
- Wait for the "waiting for CMD" message in the <SiROC
Messages> window
- Disable Writing to Disk
- Set runtype to AllBeam
- Start a run
- Click on the
icon on the menu bar at the bottom of the screen
on Online Monitoring 3, this will restart all online
clients
- Follow the instructions for :
OR Follow the instructions for
:
- The 2 red buttons on SiMon under <OctVtx> should turn green
within 20 seconds
- Click on <Restart ROCDB> under the <SiExpert> menu on the DAQ gui.
- The <OnlLatchup1> client on the Online Monitoring #3
computer should also become green in 30 seconds
- The <OnlLatchup2> client on the Online Monitoring #3
computer should also become green after few minutes
- If either the <OnLatchup1> or the <OnlLatchup2> client
becomes red, or the <OnlLatchup1> client alarm goes off on the <Central
Alarmer>,
(make sure they are running), call Silicon EXPERT.