PPT Slide
- mercury system will have an ethernet connection to the DAQ Sun only.
- The calibration processes (during calibration runs) will run on the DAQ Sun.
This task has been removed from the online computers.
- The calibration constants will be loaded from the DAQ Sun into the mercury
system at the beginning of each run. They will be written back and this data
They (or a header with a pointer to it) will be stored in the db.
- The pedestal values will be treated as the calibration constants.
- All the time when the Silicons are powered, fec, dmu, mercury system and
the event builder have to run as well, to control temperature and voltages.
- The data flow to/from the slow control system may change. During the discussions
that lead to these displays nobody of the slow control was present.