Bird's eye view of the 2 O'clock intersection region at RHIC
with the BRAHMS Experiment installed. The bottom of the figure
corresponds to the direction towards the center of the RHIC
ring, with the 2 O'clock hall itself occupying the top left part
of the figure. Shown inside the hall are the final beam focussing
magnet DX (along the beamline), the BRAHMS midrapidity spectrometer
("above" the beamline), and the BRAHMS forward angle spectrometer
("below" the beamline). Also shown are the proposed locations
of shielding blocks and the electronics hut (just outside the hall)
as well as the magnet power supply area and counting house.
This drawing is dated 24 May 1995.