-- Betty McBreen E-MAIL mcbreen@bnl.gov PHONE 516-344-5111 FAX 516-344-1334 Most UPS tests on pii3 went smoothly. The UPS had no problem shutting down pii3 in the time alloted.. but, sadly, failed to shut itself down in a timely fashion. So, we'd like to investigate further and rerun the UPS tests on opus as well. This will be done Wednesday April 5 at 2:00PM. As pii3 is the file server, the pii's will be unavailable during this time. Things should be back by 4:00PM.
This archive was generated by hypermail 2b29 : Wed Mar 22 2000 - 14:16:21 EST