Shifter leader was cn Shifters were nt 1. We run *FS 6 deg. 861 B (D1,D2,D3,D4) + MRS 90 deg. 700 B: 1 Full Stores *FS 6 deg. 861 A (D1,D2,D3,D4) + MRS 90 deg. 700 A: 2 Full Stores 2. The condition of FS 6 deg. 861 B (D1,D2,D3,D4) + MRS 90 deg. 700 B: 1 Full Stores x 4 runs (~2 hrs). The condition of FS 6 deg. 861 A (D1,D2,D3,D4) + MRS 90 deg. 700 A: 2 Full Stores x 2 runs (~1 hr). 3. The detectors are fine. _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Sat Jun 17 08:01:19 2006
This archive was generated by hypermail 2.1.8 : Sat Jun 17 2006 - 08:01:28 EDT