Shifter leader was rk Shifters were nt 1. Machine development until 4.30 with a very unstable beam. Since then we have beam. 2. Runs 16112 - 16116 with FS @ 3deg @ 1723B and MRS @ 45deg @1050B 3. Several problems: - Shower Max R1 tripped at the beginning of shift. - Connection with FB3 was lost, restarting it wasn't easy, but finally we succeeded. Unfortunately we resetted low voltages for the DC - not all came back to what it used to be before. First we had no counts in several planes. Now we have them, but they seem to be a little low. - Frame L1458A was off, we had to turn it on, and also voltages on TPCs and DVM. _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Tue Jun 13 08:01:38 2006