Dear Collaborators,

 

The 62 GeV run is approaching.

 

The current schedule for the run is   

 

Mon.  June 5th 2 pm  End 200 GeV run Begin 22 GeV test run (Ggamma=21.5)  

Tue.   June 6th 2 pm  End 22 GeV test run Begin 62.4 GeV setup  

Thur.  June 8th 4 pm  Begin 62.4 GeV Physics run  

Tue.   June 20th 6 pm End 62.4 GeV run Begin 500 GeV test run  

Mon.  June 26th 6 am End 500 GeV run Begin Warm Up to LN temperature.

 

The latest schedule can be found at the Run06 Scheduling Physicists page:

http://www.agsrhichome.bnl.gov/SchedPhys/FY2006/

 

The shift schedule can be found at

http://brahms-web.brahms.bnl.gov/shift/shifts/CurrentShiftList.htm

If you have a problem with the schedule, please let me know.

 

We took a few stores at 200 GeV last week for setting-up detectors

and timing.   The data set taken yesterday, which covers the missing 

4deg. 1/4B at 200 GeV, can be considered as physics data set.   

A Vernier scan was done at BRAHMS at the end of the store yesterday 

also. (See the e-log for details.)  

 

Cheers, JH  

 




_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Mon Jun 5 10:50:37 2006

This archive was generated by hypermail 2.1.8 : Mon Jun 05 2006 - 10:50:50 EDT