Shifter leader was JHL Shifters were 1. Beam: - Physics Beam for the entire shift: 8 hours - ZDC: 800 - 600/sec with 111 bunches. - Polarization B/Y = 47/50% 2. Data: - FS at 2.3 deg. 1/1B - Runs 15656 - 15670 - 2.2 M Trigger2 Events - No MRS data taken due to TPM2 Drift Voltage Problem 3. Problems: - HV 1458A/slot7 for TPM2 Drift Voltage gone bad (Need an access. Will be fixed tomorrow) - Old problems: 2 bad TDCs in H1, T3-3 _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Sun Jun 19 15:56:54 2005
This archive was generated by hypermail 2.1.8 : Sun Jun 19 2005 - 15:57:01 EDT