Shifter leader was SB Shifters were 1. There was beam the whole shift<br> 2. Runs 15583-15595<br> Trig2(241k),Trig3(373k) ,Trig4(210k) ,Trig5(158k) ,Trig6(128k)<br> 3. No detector related problems<br> -------------------------------------------<br> Time Blue Pol. (%) Yellow Pol. (%)<br> -------------------------------------------<br> 16:45 -43.67+/-2.37 -48.59+/-2.25<br> 19:45 -45.62+/-2.38 -45.33+/-2.33<br> 22:45 -47.47+/-2.43 -46.79+/-2.25<br> _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Sat Jun 18 00:05:27 2005
This archive was generated by hypermail 2.1.8 : Sat Jun 18 2005 - 00:05:39 EDT