Shifter leader was HHD
Shifters were 


1. MCR took their time establishing the beam; but once it was up there were no problems.

2. Data runs:
   FS@4B2442, MRS@60A700: 15167*,15168*,15169*,15170
   TPC pedestal run: 15165
   non-TPC pedestal run: 15166

3. The BB voltages are jamming. There was a problem with the TPC voltages being off (the runs marked with * above were taken during this) but JHL fixed it.