Shifter leader was HHD Shifters were 1. MCR took their time establishing the beam; but once it was up there were no problems. 2. Data runs: FS@4B2442, MRS@60A700: 15167*,15168*,15169*,15170 TPC pedestal run: 15165 non-TPC pedestal run: 15166 3. The BB voltages are jamming. There was a problem with the TPC voltages being off (the runs marked with * above were taken during this) but JHL fixed it. _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Fri Jun 3 23:52:33 2005