Shifter leader was rk Shifters were 1. After false fire alarm at 2 o'clock beam injected into RICH at 0400 was quickly dumped which was caused by trip in our D1 magnet. Another injection at 0500, taking data since 0600. 2. Pedestals, 2 physics runs. 3. At 0730 I discovered that CC is not working (for 5-10 min I would say). Reseting BB3 mainframe thrice didn't work, now running without it. _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Sat May 21 08:06:20 2005
This archive was generated by hypermail 2.1.8 : Sat May 21 2005 - 08:06:33 EDT