[Brahms-l] Shift report 20050518 16:00-24:00

From: <apache@brahms-web.brahms.bnl.gov>
Date: Wed May 18 2005 - 00:01:01 EDT
Shifter leader was Hiro
Shifters were 


1.  Beam for most of the shift.
    But, D1 and D2 tripped once.
    D1 trip caused the beam abort.
    D2 trip did not caused the beam abort, but MCR claimed that it affected the orbit of the beam.  It also tripped T3.
2.  See E-log
3.  NONE. 

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Wed May 18 00:01:24 2005

This archive was generated by hypermail 2.1.8 : Wed May 18 2005 - 00:01:44 EDT