Shifter leader was SB Shifters were 1. Beam from about 8:30 am to 11:30 am. Beam aborted due to beam permit interlock. 2. FFS @2.3 deg @3450B, MRS @90 deg @2255B runs 14669 14670 14671 14672 14673 trig2(505810) trig3(164569) trig4(61175) trig5(632426) 3. Cathods for T3, T5 and HV for TRMRS, TOFW, and H1 tripped due to the beam abort. They have been reset from the mainframes for MRS and FFS _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Sun May 15 16:01:04 2005
This archive was generated by hypermail 2.1.8 : Sun May 15 2005 - 16:01:15 EDT