[Brahms-l] Shift report 20050515 08:00-16:00

From: <apache@brahms-web.brahms.bnl.gov>
Date: Sun May 15 2005 - 16:00:49 EDT
Shifter leader was SB
Shifters were 


1. Beam from about 8:30 am to 11:30 am. Beam aborted due to beam permit interlock.
2. FFS @2.3 deg @3450B, MRS @90 deg @2255B
runs 14669 14670 14671 14672 14673 
trig2(505810) trig3(164569) trig4(61175) trig5(632426)
3. Cathods for T3, T5 and HV for TRMRS, TOFW, and H1 tripped due to the beam abort. They have been reset from the mainframes for MRS and FFS