[Brahms-l] Shift report 20050514 16:00-24:00

From: <apache@brahms-web.brahms.bnl.gov>
Date: Sat May 14 2005 - 00:00:57 EDT
Shifter leader was SB
Shifters were 


1. Beam on from 8:40 PM and is scheduled to be dumped at 1:00 AM
2. FS @2.3 deg @3450B, MRS @90 deg @2255B

trig2(656054) 	trig3(118727) 	trig4(69628) 	trig5(735819)

3. No detector problems
-----------------------------------------------------------------
Time(PM)    Blue pol.(%)    Yellow Pol. (%)
-------------------------------------------
8:33         58.7+/-2.6      43.6 +/-2.6
10:33        53.8+/-2.6      47.7+/-2.6
--------------------------------------------


_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Sat May 14 00:01:16 2005

This archive was generated by hypermail 2.1.8 : Sat May 14 2005 - 00:01:28 EDT