Shifter leader was Thomas Materna Shifters were Machine setup until 30 min before end of shift. Loss of yellow beam intensity, beam dumped twice. runs 14584 to 14591. No problems with detector, just a little problem with D2 magnet at the beginning of the shift. _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Thu May 12 00:11:54 2005
This archive was generated by hypermail 2.1.8 : Thu May 12 2005 - 00:12:06 EDT