Shifter leader was SB
Shifters were 


1. First new store at 2:00 am aborted about 15 minutes later due to RHIC Quench link problem. Second new store around 4:50 am and still on.

2. FS @2.3 deg @3450A , MRS @90 deg @1050A

trig2(424k), trig3(154k), trig4(607k), trig5(602k), trig6(500k)

3. No detector problems
-----------------------------------------------
Time(AM)     Blue Pol.(%)   Yellow Pol.(%)
-----------------------------------------------
2:00          48.8+/-2.9      46.6+/-2.7
5:00          49.2+/-2.9      45.6+/-2.7
6:50          50.7+/-2.9      49.4+/-2.6
-----------------------------------------------