[Brahms-l] Shift report 20050430 16:00-24:00

From: <apache@brahms-web.brahms.bnl.gov>
Date: Sat Apr 30 2005 - 23:57:13 EDT
Shifter leader was sk
Shifters were 


1. Beam till 10p.m. than ATR power supply failure.
2. Nw Magnets set.
D1 1723 B 
D2 1457 B 
D3 1501 B 
D4 1366 B 
D5 1050 A 
Tap 3 
RUN     TR2
14355   8310
14356    235
14359   8286
14360   1403
        ^^^^^
Total  17999
Pedestal run: 14357 =? CAMAC, 14358 => TPC 
3. No problems with detectors

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Sat Apr 30 23:57:31 2005

This archive was generated by hypermail 2.1.8 : Sat Apr 30 2005 - 23:57:40 EDT