Shifter leader was SB Shifters were 1. First store had to be dumped during machine setup since C-AD could not maintain the beam. Second store since 5:46 am is stable and is scheduled to be dumped at 11:45 am. 2. Fs@8 deg @2442A, MRS@45 deg @1050A trig2(3.7k), trig3(314k), trig4(56k),trig5(432k),trig6(118k) 3. No detector problems observed _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Fri Apr 29 07:57:11 2005
This archive was generated by hypermail 2.1.8 : Fri Apr 29 2005 - 07:57:23 EDT