Shifter leader was kh Shifters were Beam until 13:00 when the dumped on schedule. After that there were several problems with the Cyrogenic system which prevented more beam. Runs achieved: Run tr2 tr3 14305 1539 130k 14306 3395 564k 14307 2054 166k 14308 1643 92k This brings the total tr2 for FS 8 deg 2442 to 27k and for tr3 to 9.38M if we take out the runs from 14221 through 14250 where CC1-5 were not working. Changed D5 polarity to A _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Wed Apr 27 16:09:58 2005
This archive was generated by hypermail 2.1.8 : Wed Apr 27 2005 - 16:10:18 EDT