Shifter leader was kh
Shifters were 


Machine performed well.  Beam was dumped at 19:00, we had an access to 
replace LR4032a and beam was back at 21:00.  The changeout of the LR4032 was successful this time and hence we are back to running with the full complement of detectors.
Runs achieved
Run   tr2   tr3
No CCR1-5, BBR1-15, or MRST0
14244  42483  off
14245  40943  off
14246  34474  off
LR4032 replaced; CC1-5 and other detectors on after this
14250  52447   83314
14251  56596  175741
14252 in progress