Shifter leader was SB Shifters were 1. Physics running with beam from previous shift continued until dump at 2:05 am. Physics running since 3:20 with a 50 minute machine set up time in between while beam was on. 2. 5.5 hours of physics running. Runs 14073,14074,14075,14076,14077 3. No detector problems _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Mon Apr 18 08:02:31 2005
This archive was generated by hypermail 2.1.8 : Mon Apr 18 2005 - 08:02:44 EDT