Shifter leader was JHL Shifters were - The Last shift for Cu-Cu. - Beam at the injection energy for 6h40m. Store lengh: ~1h15m Time between stores: 8m-30m - No detector Problems. ============================================== =====Summary of the Injection Energy Run====== ============================================== - Beam: Cu29+ on Cu29+ at 11.2 GeV/n - ZDC Rates: 150 ~ 10/sec - Triggers Used: Trigger1 BB (>=1) Trigger2 FS (with RC) Trigger3 MRS (with RC) Trigger4 ZDC (at the same HV settings as 62 GeV run) Trigger5 RC+Tile>=1 Trigger6 FFS - Toral DAQ time: ~26.5 hours (Mar. 22 - Mar. 24) - Data Runs 13928 - 13993 MRS 40deg 700B: 1330K Trigger3 45deg 700B: 450K Trigger3 90deg 500A: 67K Trigger3 FS 8deg 430B: 33K/187K Trigger2/Trigger6 4deg 861B: 170K/668K Trigger2/Trigger6 4deg 1219B: 85K/359K Trigger2/Trigger6 8deg 430A: 10K/78K Trigger2/Trigger6 4deg 861A: 17K/315K Trigger2/Trigger6 4deg 1219A: 10K/239K Trigger2/Trigger6 =============================================== _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Thu Mar 24 08:02:17 2005
This archive was generated by hypermail 2.1.8 : Thu Mar 24 2005 - 08:02:24 EST