Shifter leader was sjs Shifters were Started shift preparing for injection voltage. FV fixed timing on triggers. Because of rapid falloff of beam intensity, changing runs every 1/2 hour. Also, we are not lowing voltages on beam dump. FS @ 4deg B861; MRS @ 40 deg B700 Run Trig2 13925 2.8K 13926 4.4K 13927 10.2K FS @ 8deg B861; MRS @ 40 deg B700 (FS fields should have been lowered) Run Trig2 13928 4.7K 13929 2.8K 13930 1.6K FS @8deg B430; MRS @ 40 deg B700 Run Trig2 13931 0.9K 13934 7.3K 13935 0.4K 13936 0.4K 13937 3.1K 13938 6.6K 13939 3.8K 13940 0.4K 13941 6.6K 13942 running pedestal runs: 13932 and 13933 No new detector problems noted. _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Wed Mar 23 00:12:05 2005
This archive was generated by hypermail 2.1.8 : Wed Mar 23 2005 - 00:12:14 EST