Shifter leader was rd
Shifters were 


1. There was a controlled acces for ~3 hours followed by a power dip. We only had 2 hours of beam.

2. I collected 30K trigger 2 at 8 degrees 1219A

3. Tried to fix the C4 channels that cannot reach nominal HV but failed, they continue to run ~100V below demand.