Shifter leader was kh Shifters were After solving the machine problems left over from the previous shift, we finally got beam at about 3:00am. It has been smooth running since then. Runs accomplished: Run tr3 tr6 13776 82k 214k 13777 56k 162k 13778 50k 151k 13779 60k 190k That brings the total for MRS 90 deg 700B to 838k tr2 out of a goal of 1M and for FS 6 deg 861A to 1.66M tr6 out of a goal of 2M. Beam is currently being dumped. _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Mon Mar 14 08:00:38 2005