Shifter leader was Sorin ZGURA Shifters were 1. The beam was on since the start of shift. 2. Runs: i) Standard runs | RunNo | tr2 | tr3 | 13597 | 79K | 124K | 13598 | 60K | 136K | 13610 | 78K | 176K | ------ | ----- | ---- | TOTAL | 217K | 436K ii) JH Lee made Angle Scan analysis >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> Summary of Angle Scan: <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< Time: 10:10 am - 1:00 pm (Scheduled dump was delayed for 1 hour to complete the scan) Number of events per scan ~ 100K with Trigger4,5 only + TPM1 ================================================= Yellow ================================================= Horizonral+ Max angle can be steered .05 mrad (data Not taken) ------------------------------------------------- Horizonral- 0.45 mrad (run 13599) ------------------------------------------------- Vertical+ 0.39 mrad (run 13600) ------------------------------------------------- Vertical- 0.6 mrad (run 13602) ------------------------------------------------- ================================================= Blue ================================================= Horizonral+ 0.37 mrad (run 13608) ------------------------------------------------- Horizonral- 0.7 mrad (run 13609) ------------------------------------------------- Vertical+ 0.15 mrad (run 13606) ------------------------------------------------- Vertical- 0.65 mrad (run 13607) ------------------------------------------------- 3. No detector probles _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Sun Mar 6 16:09:14 2005
This archive was generated by hypermail 2.1.8 : Sun Mar 06 2005 - 16:09:22 EST