[Brahms-l] Shift report 20050305 00:00-08:00

From: <apache@brahms-web.brahms.bnl.gov>
Date: Sat Mar 05 2005 - 08:06:56 EST
Shifter leader was SB
Shifters were 


1. 1st Store of  the night was lost after half an hour. 2nd Store was      good. Beam to be dumped at 8:10 am
2. FS moved to 8 deg. 
------------------------------------------------
FS@8 deg. and MRS@90 deg
run13574  trig4(294k)  trig5(219k)  minbias run from previous shift
------------------------------------------------
run13575 -- Non-Tpc pedestal run 
run13576 -- Tpc pedestal run 
run13577  trig2(52k)   trig3(51k)  should be moved to 8 deg in data base. I forgot to change the setting in DAQ. Sorry about that
run13578  trig2(136k)  trig3(131k)
run13579  trig2(128k)  trig3(283k)
run13580  trig2(80k)   trig3(336k)
-------------------------------------------------

3. No detector problems

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Sat Mar 5 08:07:16 2005

This archive was generated by hypermail 2.1.8 : Sat Mar 05 2005 - 08:07:25 EST